
{"id":5079,"date":"2024-10-18T16:35:56","date_gmt":"2024-10-18T16:35:56","guid":{"rendered":"https:\/\/somafel.com\/?post_type=projetos&#038;p=5079"},"modified":"2024-10-18T16:35:58","modified_gmt":"2024-10-18T16:35:58","slug":"railway-connection-between-evora-and-evora-norte-evora-bypass-new-railway-connection-between-evora-norte-and-elvas-caia-leste-line-elvas-border-subsection","status":"publish","type":"projetos","link":"https:\/\/somafel.com\/en\/projetos\/railway-connection-between-evora-and-evora-norte-evora-bypass-new-railway-connection-between-evora-norte-and-elvas-caia-leste-line-elvas-border-subsection\/","title":{"rendered":"Railway Connection between \u00c9vora and \u00c9vora Norte \u2013 \u00c9vora Bypass. New Railway Connection between \u00c9vora Norte and Elvas \/ Caia. Leste Line \u2013 Elvas \/ Border Subsection"},"content":{"rendered":"\n<p><\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Project Details<\/h3>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-table tables-news\"><table><tbody><tr><td>Start Date <\/td><td>14\/07\/2021<\/td><\/tr><tr><td>Client<\/td><td>Infraestruturas de Portugal<\/td><\/tr><tr><td>Country<\/td><td>Portugal<\/td><\/tr><tr><td>Location<\/td><td>\u00c9vora and Leste line<br>From km 117+700\u00a0\u00a0\u00a0\u00a0\u00a0 to\u00a0\u00a0\u00a0 km 275+611<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Description<\/h3>\n\n\n\n<p><\/p>\n\n\n\n<p>This project is part of the so-called Southern International Corridor (CIS), which aims to connect the Southern Ports (Sines, Set\u00fabal, and Lisbon) to the Spanish border (Caia \/ Badajoz). It is a strategically important railway route for Portugal, contributing to increased international competitiveness.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"567\" height=\"288\" src=\"https:\/\/somafel.com\/wp-content\/uploads\/2024\/10\/Picture1.png\" alt=\"\" class=\"wp-image-5083\" style=\"width:853px\" srcset=\"https:\/\/somafel.com\/wp-content\/uploads\/2024\/10\/Picture1.png 567w, https:\/\/somafel.com\/wp-content\/uploads\/2024\/10\/Picture1-300x152.png 300w\" sizes=\"auto, (max-width: 567px) 100vw, 567px\" \/><\/figure>\n\n\n\n<p>This project will enable:<\/p>\n\n\n\n<ul class=\"style-lists-news wp-block-list\">\n<li>A design speed of 250 km\/h for passenger trains and 120 km\/h for freight trains;<\/li>\n\n\n\n<li>Automation and elimination of level crossings;<\/li>\n\n\n\n<li>Operation of freight trains up to 750 meters in length;<\/li>\n\n\n\n<li>Full electrification of the line (25kV-50 Hz), for speeds up to 300 km\/h;<\/li>\n\n\n\n<li>Electronic signaling + ERTMS (ETCS N2+GSM-R);<\/li>\n\n\n\n<li>Track superstructure designed for speeds up to 250 km\/h, with the installation of polyvalent sleepers allowing for future migration to European gauge.<\/li>\n<\/ul>\n\n\n\n<p>The first phase of the project involved civil construction and various infrastructure works between \u00c9vora and \u00c9vora Norte, resulting in:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>3 railway bridges;<\/li>\n\n\n\n<li>8 standard engineering works;<\/li>\n\n\n\n<li>Treatment of various slopes;<\/li>\n\n\n\n<li>Excavation, embankment, and drainage.<\/li>\n<\/ul>\n\n\n\n<p>The second phase consists of track and catenary work between \u00c9vora and Elvas \/ Border, including:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Construction of 90 km of track superstructure;<\/li>\n\n\n\n<li>Construction of 101 km of catenary.<\/li>\n<\/ul>\n\n\n\n<p>This is the largest Portuguese railway project in the last 100 years, with SOMAFEL leading the consortium formed by SOMAFEL, TEIXEIRA DUARTE, MOTA-ENGIL, and MOTA-ENGIL RAILWAY.<\/p>\n\n\n\n<div style=\"height:22px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-full\"><a href=\"https:\/\/somafel.com\/wp-content\/uploads\/2024\/10\/AERO_baixa.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"2472\" height=\"1391\" data-id=\"5087\" src=\"https:\/\/somafel.com\/wp-content\/uploads\/2024\/10\/AERO_baixa.jpg\" alt=\"\" class=\"wp-image-5087\" srcset=\"https:\/\/somafel.com\/wp-content\/uploads\/2024\/10\/AERO_baixa.jpg 2472w, https:\/\/somafel.com\/wp-content\/uploads\/2024\/10\/AERO_baixa-300x169.jpg 300w, https:\/\/somafel.com\/wp-content\/uploads\/2024\/10\/AERO_baixa-1024x576.jpg 1024w, https:\/\/somafel.com\/wp-content\/uploads\/2024\/10\/AERO_baixa-768x432.jpg 768w, https:\/\/somafel.com\/wp-content\/uploads\/2024\/10\/AERO_baixa-1536x864.jpg 1536w, https:\/\/somafel.com\/wp-content\/uploads\/2024\/10\/AERO_baixa-2048x1152.jpg 2048w\" sizes=\"auto, (max-width: 2472px) 100vw, 2472px\" \/><\/a><\/figure>\n\n\n\n<figure class=\"wp-block-image size-full\"><a href=\"https:\/\/somafel.com\/wp-content\/uploads\/2024\/10\/AERO_LE_baixa.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"2472\" height=\"1391\" data-id=\"5091\" src=\"https:\/\/somafel.com\/wp-content\/uploads\/2024\/10\/AERO_LE_baixa.jpg\" alt=\"\" class=\"wp-image-5091\" srcset=\"https:\/\/somafel.com\/wp-content\/uploads\/2024\/10\/AERO_LE_baixa.jpg 2472w, https:\/\/somafel.com\/wp-content\/uploads\/2024\/10\/AERO_LE_baixa-300x169.jpg 300w, https:\/\/somafel.com\/wp-content\/uploads\/2024\/10\/AERO_LE_baixa-1024x576.jpg 1024w, https:\/\/somafel.com\/wp-content\/uploads\/2024\/10\/AERO_LE_baixa-768x432.jpg 768w, https:\/\/somafel.com\/wp-content\/uploads\/2024\/10\/AERO_LE_baixa-1536x864.jpg 1536w, https:\/\/somafel.com\/wp-content\/uploads\/2024\/10\/AERO_LE_baixa-2048x1152.jpg 2048w\" sizes=\"auto, (max-width: 2472px) 100vw, 2472px\" \/><\/a><\/figure>\n\n\n\n<figure class=\"wp-block-image size-full\"><a href=\"https:\/\/somafel.com\/wp-content\/uploads\/2024\/10\/AERO_LE_VC_baixa.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"2472\" height=\"1391\" data-id=\"5095\" src=\"https:\/\/somafel.com\/wp-content\/uploads\/2024\/10\/AERO_LE_VC_baixa.jpg\" alt=\"\" class=\"wp-image-5095\" srcset=\"https:\/\/somafel.com\/wp-content\/uploads\/2024\/10\/AERO_LE_VC_baixa.jpg 2472w, https:\/\/somafel.com\/wp-content\/uploads\/2024\/10\/AERO_LE_VC_baixa-300x169.jpg 300w, https:\/\/somafel.com\/wp-content\/uploads\/2024\/10\/AERO_LE_VC_baixa-1024x576.jpg 1024w, https:\/\/somafel.com\/wp-content\/uploads\/2024\/10\/AERO_LE_VC_baixa-768x432.jpg 768w, https:\/\/somafel.com\/wp-content\/uploads\/2024\/10\/AERO_LE_VC_baixa-1536x864.jpg 1536w, https:\/\/somafel.com\/wp-content\/uploads\/2024\/10\/AERO_LE_VC_baixa-2048x1152.jpg 2048w\" sizes=\"auto, (max-width: 2472px) 100vw, 2472px\" \/><\/a><\/figure>\n\n\n\n<figure class=\"wp-block-image size-full\"><a href=\"https:\/\/somafel.com\/wp-content\/uploads\/2024\/10\/cat4.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1536\" height=\"2048\" data-id=\"5099\" src=\"https:\/\/somafel.com\/wp-content\/uploads\/2024\/10\/cat4.jpg\" alt=\"\" class=\"wp-image-5099\" srcset=\"https:\/\/somafel.com\/wp-content\/uploads\/2024\/10\/cat4.jpg 1536w, https:\/\/somafel.com\/wp-content\/uploads\/2024\/10\/cat4-300x400.jpg 300w, https:\/\/somafel.com\/wp-content\/uploads\/2024\/10\/cat4-768x1024.jpg 768w, https:\/\/somafel.com\/wp-content\/uploads\/2024\/10\/cat4-1152x1536.jpg 1152w\" sizes=\"auto, (max-width: 1536px) 100vw, 1536px\" \/><\/a><\/figure>\n\n\n\n<figure class=\"wp-block-image size-full\"><a href=\"https:\/\/somafel.com\/wp-content\/uploads\/2024\/10\/IMG-20230704-WA0001.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1920\" height=\"1080\" data-id=\"5111\" src=\"https:\/\/somafel.com\/wp-content\/uploads\/2024\/10\/IMG-20230704-WA0001.jpg\" alt=\"\" class=\"wp-image-5111\" srcset=\"https:\/\/somafel.com\/wp-content\/uploads\/2024\/10\/IMG-20230704-WA0001.jpg 1920w, https:\/\/somafel.com\/wp-content\/uploads\/2024\/10\/IMG-20230704-WA0001-300x169.jpg 300w, https:\/\/somafel.com\/wp-content\/uploads\/2024\/10\/IMG-20230704-WA0001-1024x576.jpg 1024w, https:\/\/somafel.com\/wp-content\/uploads\/2024\/10\/IMG-20230704-WA0001-768x432.jpg 768w, https:\/\/somafel.com\/wp-content\/uploads\/2024\/10\/IMG-20230704-WA0001-1536x864.jpg 1536w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\" \/><\/a><\/figure>\n\n\n\n<figure class=\"wp-block-image size-full\"><a href=\"https:\/\/somafel.com\/wp-content\/uploads\/2024\/10\/IMG-20230629-WA0003.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1920\" height=\"1080\" data-id=\"5107\" src=\"https:\/\/somafel.com\/wp-content\/uploads\/2024\/10\/IMG-20230629-WA0003.jpg\" alt=\"\" class=\"wp-image-5107\" srcset=\"https:\/\/somafel.com\/wp-content\/uploads\/2024\/10\/IMG-20230629-WA0003.jpg 1920w, https:\/\/somafel.com\/wp-content\/uploads\/2024\/10\/IMG-20230629-WA0003-300x169.jpg 300w, https:\/\/somafel.com\/wp-content\/uploads\/2024\/10\/IMG-20230629-WA0003-1024x576.jpg 1024w, https:\/\/somafel.com\/wp-content\/uploads\/2024\/10\/IMG-20230629-WA0003-768x432.jpg 768w, https:\/\/somafel.com\/wp-content\/uploads\/2024\/10\/IMG-20230629-WA0003-1536x864.jpg 1536w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\" \/><\/a><\/figure>\n\n\n\n<figure class=\"wp-block-image size-full\"><a href=\"https:\/\/somafel.com\/wp-content\/uploads\/2024\/10\/IMG-20230503-WA0006.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1920\" height=\"1080\" data-id=\"5103\" src=\"https:\/\/somafel.com\/wp-content\/uploads\/2024\/10\/IMG-20230503-WA0006.jpg\" alt=\"\" class=\"wp-image-5103\" srcset=\"https:\/\/somafel.com\/wp-content\/uploads\/2024\/10\/IMG-20230503-WA0006.jpg 1920w, https:\/\/somafel.com\/wp-content\/uploads\/2024\/10\/IMG-20230503-WA0006-300x169.jpg 300w, https:\/\/somafel.com\/wp-content\/uploads\/2024\/10\/IMG-20230503-WA0006-1024x576.jpg 1024w, https:\/\/somafel.com\/wp-content\/uploads\/2024\/10\/IMG-20230503-WA0006-768x432.jpg 768w, https:\/\/somafel.com\/wp-content\/uploads\/2024\/10\/IMG-20230503-WA0006-1536x864.jpg 1536w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\" \/><\/a><\/figure>\n<\/figure>\n","protected":false},"featured_media":5115,"template":"","class_list":["post-5079","projetos","type-projetos","status-publish","has-post-thumbnail","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Railway Connection between \u00c9vora and \u00c9vora Norte \u2013 \u00c9vora Bypass. New Railway Connection between \u00c9vora Norte and Elvas \/ Caia. Leste Line \u2013 Elvas \/ Border Subsection - SOMAFEL<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/somafel.com\/en\/projetos\/railway-connection-between-evora-and-evora-norte-evora-bypass-new-railway-connection-between-evora-norte-and-elvas-caia-leste-line-elvas-border-subsection\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Railway Connection between \u00c9vora and \u00c9vora Norte \u2013 \u00c9vora Bypass. New Railway Connection between \u00c9vora Norte and Elvas \/ Caia. Leste Line \u2013 Elvas \/ Border Subsection - SOMAFEL\" \/>\n<meta property=\"og:description\" content=\"Project Details Start Date 14\/07\/2021 Client Infraestruturas de Portugal Country Portugal Location \u00c9vora and Leste lineFrom km 117+700\u00a0\u00a0\u00a0\u00a0\u00a0 to\u00a0\u00a0\u00a0 km 275+611 Description This project is part of the so-called Southern International Corridor (CIS), which aims to connect the Southern Ports (Sines, Set\u00fabal, and Lisbon) to the Spanish border (Caia \/ Badajoz). It is a strategically [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/somafel.com\/en\/projetos\/railway-connection-between-evora-and-evora-norte-evora-bypass-new-railway-connection-between-evora-norte-and-elvas-caia-leste-line-elvas-border-subsection\/\" \/>\n<meta property=\"og:site_name\" content=\"SOMAFEL\" \/>\n<meta property=\"article:modified_time\" content=\"2024-10-18T16:35:58+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/somafel.com\/wp-content\/uploads\/2024\/10\/cover.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1920\" \/>\n\t<meta property=\"og:image:height\" content=\"500\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/somafel.com\/en\/projetos\/railway-connection-between-evora-and-evora-norte-evora-bypass-new-railway-connection-between-evora-norte-and-elvas-caia-leste-line-elvas-border-subsection\/\",\"url\":\"https:\/\/somafel.com\/en\/projetos\/railway-connection-between-evora-and-evora-norte-evora-bypass-new-railway-connection-between-evora-norte-and-elvas-caia-leste-line-elvas-border-subsection\/\",\"name\":\"Railway Connection between \u00c9vora and \u00c9vora Norte \u2013 \u00c9vora Bypass. New Railway Connection between \u00c9vora Norte and Elvas \/ Caia. Leste Line \u2013 Elvas \/ Border Subsection - SOMAFEL\",\"isPartOf\":{\"@id\":\"https:\/\/somafel.com\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/somafel.com\/en\/projetos\/railway-connection-between-evora-and-evora-norte-evora-bypass-new-railway-connection-between-evora-norte-and-elvas-caia-leste-line-elvas-border-subsection\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/somafel.com\/en\/projetos\/railway-connection-between-evora-and-evora-norte-evora-bypass-new-railway-connection-between-evora-norte-and-elvas-caia-leste-line-elvas-border-subsection\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/somafel.com\/wp-content\/uploads\/2024\/10\/cover.jpg\",\"datePublished\":\"2024-10-18T16:35:56+00:00\",\"dateModified\":\"2024-10-18T16:35:58+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/somafel.com\/en\/projetos\/railway-connection-between-evora-and-evora-norte-evora-bypass-new-railway-connection-between-evora-norte-and-elvas-caia-leste-line-elvas-border-subsection\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/somafel.com\/en\/projetos\/railway-connection-between-evora-and-evora-norte-evora-bypass-new-railway-connection-between-evora-norte-and-elvas-caia-leste-line-elvas-border-subsection\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/somafel.com\/en\/projetos\/railway-connection-between-evora-and-evora-norte-evora-bypass-new-railway-connection-between-evora-norte-and-elvas-caia-leste-line-elvas-border-subsection\/#primaryimage\",\"url\":\"https:\/\/somafel.com\/wp-content\/uploads\/2024\/10\/cover.jpg\",\"contentUrl\":\"https:\/\/somafel.com\/wp-content\/uploads\/2024\/10\/cover.jpg\",\"width\":1920,\"height\":500},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/somafel.com\/en\/projetos\/railway-connection-between-evora-and-evora-norte-evora-bypass-new-railway-connection-between-evora-norte-and-elvas-caia-leste-line-elvas-border-subsection\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Start\",\"item\":\"https:\/\/somafel.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Projects\",\"item\":\"https:\/\/somafel.com\/en\/projetos\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Railway Connection between \u00c9vora and \u00c9vora Norte \u2013 \u00c9vora Bypass. New Railway Connection between \u00c9vora Norte and Elvas \/ Caia. Leste Line \u2013 Elvas \/ Border Subsection\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/somafel.com\/en\/#website\",\"url\":\"https:\/\/somafel.com\/en\/\",\"name\":\"SOMAFEL\",\"description\":\"Railway Works Experts\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/somafel.com\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Railway Connection between \u00c9vora and \u00c9vora Norte \u2013 \u00c9vora Bypass. New Railway Connection between \u00c9vora Norte and Elvas \/ Caia. Leste Line \u2013 Elvas \/ Border Subsection - SOMAFEL","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/somafel.com\/en\/projetos\/railway-connection-between-evora-and-evora-norte-evora-bypass-new-railway-connection-between-evora-norte-and-elvas-caia-leste-line-elvas-border-subsection\/","og_locale":"en_US","og_type":"article","og_title":"Railway Connection between \u00c9vora and \u00c9vora Norte \u2013 \u00c9vora Bypass. New Railway Connection between \u00c9vora Norte and Elvas \/ Caia. Leste Line \u2013 Elvas \/ Border Subsection - SOMAFEL","og_description":"Project Details Start Date 14\/07\/2021 Client Infraestruturas de Portugal Country Portugal Location \u00c9vora and Leste lineFrom km 117+700\u00a0\u00a0\u00a0\u00a0\u00a0 to\u00a0\u00a0\u00a0 km 275+611 Description This project is part of the so-called Southern International Corridor (CIS), which aims to connect the Southern Ports (Sines, Set\u00fabal, and Lisbon) to the Spanish border (Caia \/ Badajoz). It is a strategically [&hellip;]","og_url":"https:\/\/somafel.com\/en\/projetos\/railway-connection-between-evora-and-evora-norte-evora-bypass-new-railway-connection-between-evora-norte-and-elvas-caia-leste-line-elvas-border-subsection\/","og_site_name":"SOMAFEL","article_modified_time":"2024-10-18T16:35:58+00:00","og_image":[{"width":1920,"height":500,"url":"https:\/\/somafel.com\/wp-content\/uploads\/2024\/10\/cover.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/somafel.com\/en\/projetos\/railway-connection-between-evora-and-evora-norte-evora-bypass-new-railway-connection-between-evora-norte-and-elvas-caia-leste-line-elvas-border-subsection\/","url":"https:\/\/somafel.com\/en\/projetos\/railway-connection-between-evora-and-evora-norte-evora-bypass-new-railway-connection-between-evora-norte-and-elvas-caia-leste-line-elvas-border-subsection\/","name":"Railway Connection between \u00c9vora and \u00c9vora Norte \u2013 \u00c9vora Bypass. New Railway Connection between \u00c9vora Norte and Elvas \/ Caia. Leste Line \u2013 Elvas \/ Border Subsection - SOMAFEL","isPartOf":{"@id":"https:\/\/somafel.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/somafel.com\/en\/projetos\/railway-connection-between-evora-and-evora-norte-evora-bypass-new-railway-connection-between-evora-norte-and-elvas-caia-leste-line-elvas-border-subsection\/#primaryimage"},"image":{"@id":"https:\/\/somafel.com\/en\/projetos\/railway-connection-between-evora-and-evora-norte-evora-bypass-new-railway-connection-between-evora-norte-and-elvas-caia-leste-line-elvas-border-subsection\/#primaryimage"},"thumbnailUrl":"https:\/\/somafel.com\/wp-content\/uploads\/2024\/10\/cover.jpg","datePublished":"2024-10-18T16:35:56+00:00","dateModified":"2024-10-18T16:35:58+00:00","breadcrumb":{"@id":"https:\/\/somafel.com\/en\/projetos\/railway-connection-between-evora-and-evora-norte-evora-bypass-new-railway-connection-between-evora-norte-and-elvas-caia-leste-line-elvas-border-subsection\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/somafel.com\/en\/projetos\/railway-connection-between-evora-and-evora-norte-evora-bypass-new-railway-connection-between-evora-norte-and-elvas-caia-leste-line-elvas-border-subsection\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/somafel.com\/en\/projetos\/railway-connection-between-evora-and-evora-norte-evora-bypass-new-railway-connection-between-evora-norte-and-elvas-caia-leste-line-elvas-border-subsection\/#primaryimage","url":"https:\/\/somafel.com\/wp-content\/uploads\/2024\/10\/cover.jpg","contentUrl":"https:\/\/somafel.com\/wp-content\/uploads\/2024\/10\/cover.jpg","width":1920,"height":500},{"@type":"BreadcrumbList","@id":"https:\/\/somafel.com\/en\/projetos\/railway-connection-between-evora-and-evora-norte-evora-bypass-new-railway-connection-between-evora-norte-and-elvas-caia-leste-line-elvas-border-subsection\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Start","item":"https:\/\/somafel.com\/en\/"},{"@type":"ListItem","position":2,"name":"Projects","item":"https:\/\/somafel.com\/en\/projetos\/"},{"@type":"ListItem","position":3,"name":"Railway Connection between \u00c9vora and \u00c9vora Norte \u2013 \u00c9vora Bypass. New Railway Connection between \u00c9vora Norte and Elvas \/ Caia. Leste Line \u2013 Elvas \/ Border Subsection"}]},{"@type":"WebSite","@id":"https:\/\/somafel.com\/en\/#website","url":"https:\/\/somafel.com\/en\/","name":"SOMAFEL","description":"Railway Works Experts","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/somafel.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"uagb_featured_image_src":{"full":["https:\/\/somafel.com\/wp-content\/uploads\/2024\/10\/cover.jpg",1920,500,false],"thumbnail":["https:\/\/somafel.com\/wp-content\/uploads\/2024\/10\/cover-150x150.jpg",150,150,true],"medium":["https:\/\/somafel.com\/wp-content\/uploads\/2024\/10\/cover-300x78.jpg",300,78,true],"medium_large":["https:\/\/somafel.com\/wp-content\/uploads\/2024\/10\/cover-768x200.jpg",768,200,true],"large":["https:\/\/somafel.com\/wp-content\/uploads\/2024\/10\/cover-1024x267.jpg",1024,267,true],"1536x1536":["https:\/\/somafel.com\/wp-content\/uploads\/2024\/10\/cover-1536x400.jpg",1536,400,true],"2048x2048":["https:\/\/somafel.com\/wp-content\/uploads\/2024\/10\/cover.jpg",1920,500,false],"custom-size":["https:\/\/somafel.com\/wp-content\/uploads\/2024\/10\/cover-390x260.jpg",390,260,true]},"uagb_author_info":{"display_name":"Marketing Teixeira Duarte","author_link":"https:\/\/somafel.com\/en\/author\/"},"uagb_comment_info":0,"uagb_excerpt":"Project Details Start Date 14\/07\/2021 Client Infraestruturas de Portugal Country Portugal Location \u00c9vora and Leste lineFrom km 117+700\u00a0\u00a0\u00a0\u00a0\u00a0 to\u00a0\u00a0\u00a0 km 275+611 Description This project is part of the so-called Southern International Corridor (CIS), which aims to connect the Southern Ports (Sines, Set\u00fabal, and Lisbon) to the Spanish border (Caia \/ Badajoz). It is a strategically&hellip;","_links":{"self":[{"href":"https:\/\/somafel.com\/en\/wp-json\/wp\/v2\/projetos\/5079","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/somafel.com\/en\/wp-json\/wp\/v2\/projetos"}],"about":[{"href":"https:\/\/somafel.com\/en\/wp-json\/wp\/v2\/types\/projetos"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/somafel.com\/en\/wp-json\/wp\/v2\/media\/5115"}],"wp:attachment":[{"href":"https:\/\/somafel.com\/en\/wp-json\/wp\/v2\/media?parent=5079"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}