Brasília Metro Maintenance

Project Details

Start Date December 2015
End Date July 2016
ClientMetro DF – Companhia do Metropolitano do distrito federal 
CountryBrazil
LocationBrasília
Project Status Completed

Description

Between December 2015 and July 2016, SOMAFEL was responsible for the maintenance of the Brasília Metro System, covering the following aspects:

• Rolling Stock – Preventive and corrective maintenance of 32 Electrical Triple Units • Signalling, Control, Telecommunications and Ventilation (SCT/VT) – Preventive and corrective maintenance of the Signalling, Telecommunications and Ventilation Systems • Power – Preventive and corrective maintenance of the electric power supply system, comprising 78.6 km of third rail and 48 substations. • Permanent track – Preventive and corrective maintenance of the permanent track system, comprising 81.5 km of track and 90 switches and crossings. • Buildings – Preventive and corrective maintenance of buildings (stations).