Brasília Metro Maintenance

Project Details

Start Date December 2015
End Date July 2016
ClientMetro DF – Companhia do Metropolitano do distrito federal 
CountryBrazil
LocationBrasília
Project Status Completed

Description

Between December 2015 and July 2016, SOMAFEL was responsible for the maintenance of the Brasília Metro System, covering the following aspects:

• Rolling Stock – Preventive and corrective maintenance of 32 Electrical Triple Units • Signalling, Control, Telecommunications and Ventilation (SCT/VT) – Preventive and corrective maintenance of the Signalling, Telecommunications and Ventilation Systems • Power – Preventive and corrective maintenance of the electric power supply system, comprising 78.6 km of third rail and 48 substations. • Permanent track – Preventive and corrective maintenance of the permanent track system, comprising 81.5 km of track and 90 switches and crossings. • Buildings – Preventive and corrective maintenance of buildings (stations).

Cofinanciamento
Privacy Overview
SOMAFEL

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.

Strictly Necessary Cookies

Strictly Necessary Cookie should be enabled at all times so that we can save your preferences for cookie settings.

Analytics

This website uses Google Analytics to collect anonymous information such as the number of visitors to the site, and the most popular pages.

Keeping this cookie enabled helps us to improve our website.