Requalification of the Railway Branch of the Port of Sines

Project Details

Start Date 2019
Client Administração do Porto de Sines e do Algarve, S.A.
Country Portugal
Location Sines

Description

A project aimed at providing the terminal with better operating and manoeuvring conditions and to increase the installed capacity, allowing the movement of 36 trains per day, of 750 meters each.

SOMAFEL conducted the complete renovation of the track superstructure, including ballast cleaning, the settlement of new track composed of rail 60E1 and single block concrete sleepers, of switches and crossings, ballast regulation, track leelling, aligning and tamping, and dynamic track stabilising.

Being also responsible for electrification of the new lines

Cofinanciamento
Privacy Overview
SOMAFEL

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.

Strictly Necessary Cookies

Strictly Necessary Cookie should be enabled at all times so that we can save your preferences for cookie settings.

Analytics

This website uses Google Analytics to collect anonymous information such as the number of visitors to the site, and the most popular pages.

Keeping this cookie enabled helps us to improve our website.