| Start Date | January 2009 |
| End Date | |
| Client | ANESRIF – Agence Nationale d’Etudes et de Suivi de la Réalisation des Investissements Ferroviaires |
| Country | Algeria |
| Location | Thenia – Oued Aissi |
| Project Status | Underway |
1. Design and Construction of 56 km of Track. 2. Design and Installation of 65 km of Overhead Line. 3. Design and Construction of 2 Substations.
The project consisted of the construction of 56 km of Track and installation of 65 km of Overhead Line, between Thenia and Oued Aissi. The Project also included the preparation of the final design of the track and electrification system, as well as the design and installation of both substations.


