| Start Date | July 2001 |
| End Date | August 2005 |
| Client | Metro do Porto |
| Country | Portugal |
| Location | Porto |
| Project Status | Completed |
1. Construction of 38.9 km of ballast track 2. Construction of 10.5 km of slab track 3. Installation of 69 switches (8 on slab track)
In the field of Light Rail transport systems, SOMAFEL was heavily involved in the construction of the Porto Light Rail network between 2001 and 2005.
• Construction of the Santo Ovídio Terminal on the S Line; • Repositioning of the girders and replacement of the rail fastenings on the wooden sleepers on Luiz I Bridge (S Line); • Construction of the upper platform and accesses to the Guifões Maintenance Depot and Workshops; • Design and construction of the Instituto Universitário da Maia (ISMAI) Terminal, on the Trofa Line; • Works to adapt Senhora da Hora station to the Póvoa Line Terminal; • Construction of the platform and tracks of the Guifões Maintenance Depot and Workshops;