| Start Date | May 2006 |
| End Date | August 2006 |
| Client | SPC – Serviço Português de Contentores |
| Country | Portugal |
| Location | Valongo |
| Project Status | Completed |
1. Construction of 1.7 km of ballast track 2. Construction of 0.6 km of embedded track 3. Installation of 11 switches and crossings 4. Construction of 1 km of Overhead Line
The construction of the Railway Complex at Valongo’s Logistics Platform included the construction of slab track, embedded track, overhead line and all the platform layers.