| Start Date | 2014 |
| End Date | 2014 |
| Client | Anglo Ferrous Minas |
| Country | Brazil |
| Location | São João da Barra |
| Project Status | Completed |
The project consisted of the installation of three crane tracks with a total length of 2800 m, with an 8 m gauge and laid over a ballast bed. In order to support the rails, this system relies on concrete blocks embedded in the ballast.