Main Gates of Hangar 6 of Lisbon Airport

Project Details

Start Date April 2015
End Date July 2015
ClientTAP Serviços – Instalações e Equipamentos
CountryPortugal
LocationLisboa
Project Status Completed

Description

The Hangar 6 project consisted of a structural intervention on the Main Gates of Hangar 6 at Humberto Delgado Airport.

The intervention consisted of the correction of the rail laying base, repair of the guiding path and replacement of the rails. Taking into account the need to keep the gates operational, the intervention was divided in three distinct phases, comprising the construction of 621 m of track, with a continuum fastening system through an high resistance elastomer.