| Start Date | February 2016 |
| End Date | December 2016 |
| Client | Consórcio Mobilidade Bahia |
| Country | Brazil |
| Location | Salvador da Bahia |
| Project Status | Completed |
1. Construction of 10 km of slab track. 2. Installation of 8 switches.
Salvador’s Metro Line 2, officially called Corredor Metro da Avenida Paralela, is a line of Salvador’s Metro and runs between the North Access and the Airport.
This project comprised the installation of the slab track, including concrete supply, on Line 2 of Salvador da Bahia’s Metro along approximately 10 km, as well as 8 switches and crossings.